@extends('layouts.guest') @include('layouts.profilestyle') @section('content')

Inspection Work Order Form

{{--

Inquiry No:

--}}
@csrf
cc

Najma Consultancy

Doc No
Rev. Date

INSPECTION WORK ORDER

Rev. No.
Page No.

{{--
To be filled by Sales Representative
--}}
Date Created :

Job Assignment
Work Order No Date
Client Name
Contact Name Contact No
Inspection Location LPO/ Ref
Inspection Requested Date Time From Time To

SR NO ITEM QUANTITY EIAC NON EIAC
Additional Instructions if Any (MKT)
Name ( MKT)
Signature
Date
Acceptance of Job Order - Technical Manager ( Name/Sign) :
Date :

{{--
To be filled by the Technical Manager (TM)
--}}
Assigned Inspection Engineer
Documents Handover Checklist Timesheet
Location Map Copy Attached WhatsApp Email N/A
Gate Pass Copy Attached WhatsApp Email N/A
Transport Arrangement NAJMA By Own Client Pick up N/A
Inspection Photos Required Not Required
Equipment to Use Equipment No.
Additional Instruction if any (TM)
Name (TM)
Signature
Date
Acceptance from Inspection Engineer (Sign) :
Date :


Please refer to next page for additional information.

Important:
  1. Inspection Engineer shall handover the inspection documents to Technical Manager 24 hrs after completion of inspection
  2. Technical Manager shall issue the Inspection Certificate or Report within 48 hrs from time of inspection in coordination with the Senior Admin.


Comments from Inspector (If any, after inspection)
Inspector Name :
Signature :
Date :

Take Over by Inspection Admin/Coordinator

Work Order
Timesheet
Checklist
Inspection Photos
Inspection Certificates
Inspection Report (if applicable)
Client Feedback Form

Admin / Coordinator Name :
Signature :
Date :

@endsection